Starbucks Coffee Co
A1215 N 91st Ave, Tolleson 85353
Food Establishment - Eating & Drinking · Permit FD-23-05098
Score based on 4 scored inspections over the county's rolling 3-year window, weighted toward recent visits. How scoring works
Score over time
Inspection history10 on record
2026
Feb 25, 2026RoutinecleanA
No County legal action will result from this inspection.
2025
Jul 16, 2025RoutinecleanA°
No County legal action will result from this inspection.Discussed when to wash. Discussed 3-compartment sink. Discussed ice bucket storage.
Mar 18, 2025RoutinecleanA°
No County legal action will result from this inspection.Discussed sanitizer testing strips.
2024
Jul 15, 2024RoutinecleanA
No County legal action will result from this inspection.
May 9, 2024Reviewnot scoredclean
Final construction inspection. Construction complete and approved.Permit issued Eating and Drinking Class II 0-9 Seating.This establishment/operation has been evaluated and qualifies for the issuance of the permit. To complete the permitting process, meaning issuance of this permit, and begin operation, the applicant must first submit payment of the annual operating permit fee to the Department’s Administrative Services. Note that fees paid up to this inspection approval did not include the annual operating permit fee. PAYMENT with a credit/debit card can be made via phone at 602-506-6824, Option 2. Payment with a credit/debit card can be made on-line via select “Pay a Fee” at esd.maricopa.gov. Please note that if you select payment via online, the annual operating permit fee invoice may take up to 7 business days to post online. Checks and money orders are also accepted via US Mail. If you select payment via US Mail. For further instructions on mail in payments please refer to the printed invoice.Per MCEHC Chapter I, Regs 4 & 5, no person shall conduct an operation or operate an establishment for which a permit is required without holding the necessary and valid permit to do so. No operating permit is valid, until the permit fee is received by the Department. It is also the responsibility of the permit holder/owner to notify MCESD if there are contact/ billing address changes.No County Legal action will result from this inspection.E-mailed inspection report.
May 1, 2024Reviewnot scoredclean
Pre-final walk through. Store has hot water, backflow valves are in place and have been tested and the refrigeration units are in and holding at temperature.Superintendent will follow up on:1). Installing the hot water faucets.2). Finishing up the ice machine plumbing, waste and water lines and installation of the ice dispenser.3). Drive trough window will receive microswitch. 4). Backflow valve will be re-mounted under west side rinser.5). Please make sure all chemical dispensers are being installed at the sinks.Store is okay to stock and train after City TCO.No County legal action will result from tis inspection.E-mailed inspection report.
Apr 15, 2024Reviewnot scoredclean
Second walk trough of the establishment with the superintendent. The following items were discussed:1). Schluter will be installed in the restroom.2). Hub drains will be installed under the backflow valves at the mop sink.3). Ice machine will be rigid drains.4). Flooring will be touched up and all seams closed, also at fire riser.5). Not sure if steamer is water connected. If it is please provide a RP upstream.6). Fly fans will be outfitted with micro switches.7). Hans wash sink splash guards will be siliconed to the walls.At time of final, please provide hot water at all sinks, all equipment needs to be in place, refrigeration should be on and holding at correct temperatures.No county legal action will result from this inspection.E-mailed report
Mar 7, 2024Reviewnot scoredclean
First walk through for the TI with the superintendent. The following items were discussed:1). Additional hand wash sink will be installed in the engine room.2). Ice machine drain has been addressed.There were some other changes which are reflected in the new plan.E-mailed inspection and response letters from engineer and architect.No County legal action will result from this inspection.
2023
Nov 8, 2023Reviewnot scoredclean
Reviewed revision letter and plan set. All changes approved.No County legal action will result form this inspection.Auto-e-mail
Oct 28, 2023Advisorynot scoredclean
*** THIS IS NOT AN INSPECTION REPORT. ***Plans reviewed on May 29th 2023 This email has been automatically sent and provided as a courtesy to notify you that your application and plans have been reviewed in accordance with code. You will receive a notification of “APPROVAL TO CONSTRUCT WITH CONDITIONS” letter via email or mail regarding the specifics of your plan(s). Please allow a few days to receive your letter if you selected mail on your application as a primary means of receiving correspondence. No reply to this email is required. For further instructions please refer to the letter. Thank you. *** THIS IS NOT AN INSPECTION REPORT. ***